An ʻohana in Laie,
ready for donors.
Donate nowA family of 11 sustained drastic damage when the rain caused a big hole in the ceiling and the water came pouring in and flooded the entire living room. Then it traveled through the ceiling to the other rooms creating mold throughout the home. The rain took out some foundation blocks as well. At the same time after the event, they are sheltered 5 families including young children, in tents and with a makeshift outdoor shower after they lost their entire homes to 8 feet of water in them - they opened their land for a safe haven while trying to sort through what to do. All 11 family members are living in an on site 2 bedroom Ohana home on site while waiting for help.
What this ʻohana still needs.
259 items still need funding
Sponsor a whole item, or give part of the way toward a bigger one — add as many as you like, then give once. Or fund everything for this family in one click.
Remove P-trap assembly
Remove P-trap assembly - ABS (plastic)
$13 totalNot yet funded — this family needs a first sponsor
$Remove Light fixture
Remove Light fixture
$15 totalNot yet funded — this family needs a first sponsor
$Remove Light fixture
Remove Light fixture
$15 totalNot yet funded — this family needs a first sponsor
$Remove Light fixture
Remove Light fixture
$15 totalNot yet funded — this family needs a first sponsor
$Personal protective gloves - Disposable· 48 EA
Personal protective gloves - Disposable (per pair)
$21 totalNot yet funded — this family needs a first sponsor
$Final cleaning· 37 SF
Final cleaning - construction - Residential
$21 totalNot yet funded — this family needs a first sponsor
$Final cleaning· 39.19 SF
Final cleaning - construction - Residential
$22 totalNot yet funded — this family needs a first sponsor
$Remove Plumbing fixture supply line· 3 EA
Remove Plumbing fixture supply line
$27 totalNot yet funded — this family needs a first sponsor
$Remove Angle stop valve· 3 EA
Remove Angle stop valve
$27 totalNot yet funded — this family needs a first sponsor
$Tear out trim and bag for disposal· 22 LF
Tear out trim and bag for disposal - up to Cat 3 Crown molding
$29 totalNot yet funded — this family needs a first sponsor
$Tear out baseboard and bag for disposal· 22 LF
Tear out baseboard and bag for disposal - up to Cat 3
$29 totalNot yet funded — this family needs a first sponsor
$Apply plant-based anti-microbial agent to the floor· 76.33 SF
Apply plant-based anti-microbial agent to the floor
$32 totalNot yet funded — this family needs a first sponsor
$Vapor barrier· 39.19 SF
Vapor barrier - visqueen - 6mil
$36 totalNot yet funded — this family needs a first sponsor
$Remove Sink faucet - Bathroom
Remove Sink faucet - Bathroom
$36 totalNot yet funded — this family needs a first sponsor
$Floor protection· 37 SF
Floor protection - heavy paper and tape
$36 totalNot yet funded — this family needs a first sponsor
$Clean floor - Heavy· 37 SF
Clean floor - Heavy
$38 totalNot yet funded — this family needs a first sponsor
$Floor protection· 39.19 SF
Floor protection - heavy paper and tape
$39 totalNot yet funded — this family needs a first sponsor
$Final cleaning· 76.33 SF
Final cleaning - construction - Residential
$43 totalNot yet funded — this family needs a first sponsor
$Sink - single basin - Detach
Sink - single basin - Detach
$45 totalNot yet funded — this family needs a first sponsor
$Respirator - Full face - multi-purpose resp.· 6 EA
Respirator - Full face - multi-purpose resp. (per day)
$48 totalNot yet funded — this family needs a first sponsor
$Clean the ceiling· 76.33 SF
Clean the ceiling
$48 totalNot yet funded — this family needs a first sponsor
$Final cleaning· 84.92 SF
Final cleaning - construction - Residential
$48 totalNot yet funded — this family needs a first sponsor
$Containment Barrier/Airlock/Decon. Chamber· 37 SF
Containment Barrier/Airlock/Decon. Chamber
$50 totalNot yet funded — this family needs a first sponsor
$Paint baseboard· 24.83 LF
Paint baseboard - one coat
$55 totalNot yet funded — this family needs a first sponsor
$Paint trim· 24.83 LF
Paint trim - one coat
$55 totalNot yet funded — this family needs a first sponsor
$Final cleaning· 98 SF
Final cleaning - construction - Residential
$55 totalNot yet funded — this family needs a first sponsor
$Clean floor· 76.33 SF
Clean floor
$56 totalNot yet funded — this family needs a first sponsor
$Tear out trim and bag for disposal· 40.5 LF
Tear out trim and bag for disposal Crown molding
$56 totalNot yet funded — this family needs a first sponsor
$Tear out trim and bag for disposal· 42 LF
Tear out trim and bag for disposal Crown Molding
$58 totalNot yet funded — this family needs a first sponsor
$Add for HEPA filter
Add for HEPA filter (for negative air exhaust fan)
$59 totalNot yet funded — this family needs a first sponsor
$Add for HEPA filter
Add for HEPA filter (for negative air exhaust fan)
$59 totalNot yet funded — this family needs a first sponsor
$Add for HEPA filter
Add for HEPA filter (for negative air exhaust fan)
$59 totalNot yet funded — this family needs a first sponsor
$Add for HEPA filter
Add for HEPA filter (for negative air exhaust fan)
$59 totalNot yet funded — this family needs a first sponsor
$Paint the ceiling· 39.19 SF
Paint the ceiling - one coat
$59 totalNot yet funded — this family needs a first sponsor
$Paint more than the ceiling· 40 SF
Paint more than the ceiling - one coat
$60 totalNot yet funded — this family needs a first sponsor
$Tear out and bag wet insulation - Category 3 water· 37 SF
Tear out and bag wet insulation - Category 3 water
$61 totalNot yet funded — this family needs a first sponsor
$Clean the surface area· 97.33 SF
Clean the surface area Unaffected wall
$61 totalNot yet funded — this family needs a first sponsor
$Clean floor· 84.92 SF
Clean floor
$62 totalNot yet funded — this family needs a first sponsor
$Tear out wet drywall, no bagging - Cat 3· 37 SF
Tear out wet drywall, no bagging - Cat 3
$63 totalNot yet funded — this family needs a first sponsor
$Clean floor or roof joist system· 37 SF
Clean floor or roof joist system
$63 totalNot yet funded — this family needs a first sponsor
$Clean floor or roof joist system· 39.19 SF
Clean floor or roof joist system
$67 totalNot yet funded — this family needs a first sponsor
$Paint baseboard· 30.5 LF
Paint baseboard - one coat
$67 totalNot yet funded — this family needs a first sponsor
$Tackless strip· 40.5 LF
Tackless strip - per LF
$70 totalNot yet funded — this family needs a first sponsor
$Paint paneling· 38.39 SF
Paint paneling - one coat
$71 totalNot yet funded — this family needs a first sponsor
$Seal & paint wood shelving· 7 LF
Seal & paint wood shelving, 12"-24" width
$72 totalNot yet funded — this family needs a first sponsor
$Mask and prep for paint· 24.83 LF
Mask and prep for paint - plastic, paper, tape (per LF)
$75 totalNot yet funded — this family needs a first sponsor
$Water line copper cap/plug· 2 EA
Water line copper cap/plug - per cap
$75 totalNot yet funded — this family needs a first sponsor
$Floor protection· 76.33 SF
Floor protection - heavy paper and tape
$75 totalNot yet funded — this family needs a first sponsor
$Toilet - Detach
Toilet - Detach
$76 totalNot yet funded — this family needs a first sponsor
$Final cleaning· 134.94 SF
Final cleaning - construction - Residential
$76 totalNot yet funded — this family needs a first sponsor
$R&R Plumbing fixture supply line· 2 EA
R&R Plumbing fixture supply line
$78 totalNot yet funded — this family needs a first sponsor
$Tear out tackless strip and bag for disposal - Category 3· 42 LF
Tear out tackless strip and bag for disposal - Category 3
$80 totalNot yet funded — this family needs a first sponsor
$Seal (1 coat) & paint (1 coat) trim· 24.83 LF
Seal (1 coat) & paint (1 coat) trim
$81 totalNot yet funded — this family needs a first sponsor
$Seal/prime (1 coat) then paint (1 coat) the ceiling· 39.19 SF
Seal/prime (1 coat) then paint (1 coat) the ceiling
$84 totalNot yet funded — this family needs a first sponsor
$Seal (1 coat) & paint (1 coat) baseboard· 24.83 LF
Seal (1 coat) & paint (1 coat) baseboard
$85 totalNot yet funded — this family needs a first sponsor
$Seal/prime (1 coat) then paint (1 coat) more than the ceiling· 40 SF
Seal/prime (1 coat) then paint (1 coat) more than the ceiling
$86 totalNot yet funded — this family needs a first sponsor
$Final cleaning· 154.58 SF
Final cleaning - construction - Residential
$87 totalNot yet funded — this family needs a first sponsor
$Stain & finish base shoe or quarter round· 30.5 LF
Stain & finish base shoe or quarter round
$88 totalNot yet funded — this family needs a first sponsor
$Paint trim· 40.5 LF
Paint trim - one coat
$89 totalNot yet funded — this family needs a first sponsor
$Paint baseboard· 40.5 LF
Paint baseboard - one coat
$89 totalNot yet funded — this family needs a first sponsor
$Mask and prep for paint· 30.5 LF
Mask and prep for paint - plastic, paper, tape (per LF)
$92 totalNot yet funded — this family needs a first sponsor
$Quarter round· 30.5 LF
Quarter round - 3/4"
$95 totalNot yet funded — this family needs a first sponsor
$P-trap assembly - Detach & reset
P-trap assembly - Detach & reset
$95 totalNot yet funded — this family needs a first sponsor
$Floor protection· 98 SF
Floor protection - heavy paper and tape
$96 totalNot yet funded — this family needs a first sponsor
$Mask and prep for paint· 32.17 LF
Mask and prep for paint - plastic, paper, tape (per LF)
$97 totalNot yet funded — this family needs a first sponsor
$Paint baseboard· 44.5 LF
Paint baseboard - one coat
$98 totalNot yet funded — this family needs a first sponsor
$Paint trim· 44.5 LF
Paint trim - one coat
$98 totalNot yet funded — this family needs a first sponsor
$Clean part of the walls· 158.33 SF
Clean part of the walls
$100 totalNot yet funded — this family needs a first sponsor
$Seal & paint paneling· 38.39 SF
Seal & paint paneling
$102 totalNot yet funded — this family needs a first sponsor
$Install P-trap assembly
Install P-trap assembly - ABS (plastic)
$103 totalNot yet funded — this family needs a first sponsor
$Floor protection· 54 SF
Floor protection - cloth - skid resistant, breathable
$104 totalNot yet funded — this family needs a first sponsor
$Seal (1 coat) & paint (1 coat) baseboard· 30.5 LF
Seal (1 coat) & paint (1 coat) baseboard
$105 totalNot yet funded — this family needs a first sponsor
$Detach & Reset Smoke detector
Detach & Reset Smoke detector
$105 totalNot yet funded — this family needs a first sponsor
$Add for HEPA filter
Add for HEPA filter (for canister/backpack vacuums)
$105 totalNot yet funded — this family needs a first sponsor
$Plumbing fixture supply line· 3 EA
Plumbing fixture supply line
$108 totalNot yet funded — this family needs a first sponsor
$Clean part of the walls and ceiling· 179.19 SF
Clean part of the walls and ceiling
$113 totalNot yet funded — this family needs a first sponsor
$Carpet pad· 98 SF
Carpet pad
$113 totalNot yet funded — this family needs a first sponsor
$P-trap assembly
P-trap assembly - ABS (plastic)
$114 totalNot yet funded — this family needs a first sponsor
$Paint the ceiling· 76.33 SF
Paint the ceiling - one coat
$115 totalNot yet funded — this family needs a first sponsor
$Apply plant-based anti-microbial agent· 272.67 SF
Apply plant-based anti-microbial agent to more than the walls and ceiling
$115 totalNot yet funded — this family needs a first sponsor
$Paint baseboard· 52.58 LF
Paint baseboard - one coat
$116 totalNot yet funded — this family needs a first sponsor
$Batt insulation· 37 SF
Batt insulation - 10" - R30 - unfaced batt
$116 totalNot yet funded — this family needs a first sponsor
$Clean stud wall· 88 SF
Clean stud wall
$120 totalNot yet funded — this family needs a first sponsor
$Mask and prep for paint· 40.5 LF
Mask and prep for paint - plastic, paper, tape (per LF)
$122 totalNot yet funded — this family needs a first sponsor
$Carpet labor minimum
Carpet labor minimum
$124 totalNot yet funded — this family needs a first sponsor
$Sink faucet
Sink faucet - Detach & reset Reset
$124 totalNot yet funded — this family needs a first sponsor
$Tear out non-salv vinyl, cut & bag - Category 3 water· 39.19 SF
Tear out non-salv vinyl, cut & bag - Category 3 water
$124 totalNot yet funded — this family needs a first sponsor
$Tear out wet carpet pad, cut/bag - Category 3 water· 98 SF
Tear out wet carpet pad, cut/bag - Category 3 water
$125 totalNot yet funded — this family needs a first sponsor
$Sand exposed framing - Floor· 37 SF
Sand exposed framing - Floor
$126 totalNot yet funded — this family needs a first sponsor
$Paint the ceiling· 84.92 SF
Paint the ceiling - one coat
$128 totalNot yet funded — this family needs a first sponsor
$Containment Barrier/Airlock/Decon. Chamber· 98 SF
Containment Barrier/Airlock/Decon. Chamber
$131 totalNot yet funded — this family needs a first sponsor
$Light fixture
Light fixture
$132 totalNot yet funded — this family needs a first sponsor
$Light fixture
Light fixture
$132 totalNot yet funded — this family needs a first sponsor
$Light fixture
Light fixture
$132 totalNot yet funded — this family needs a first sponsor
$Tear out wet non-salvageable carpet, cut/bag - Cat 3 water· 98 SF
Tear out wet non-salvageable carpet, cut/bag - Cat 3 water
$133 totalNot yet funded — this family needs a first sponsor
$Seal (1 coat) & paint (1 coat) trim· 40.5 LF
Seal (1 coat) & paint (1 coat) trim
$133 totalNot yet funded — this family needs a first sponsor
$Floor protection· 134.94 SF
Floor protection - heavy paper and tape
$133 totalNot yet funded — this family needs a first sponsor
$Vanity - Detach· 3.5 LF
Vanity - Detach
$133 totalNot yet funded — this family needs a first sponsor
$Mask and prep for paint· 44.5 LF
Mask and prep for paint - plastic, paper, tape (per LF)
$134 totalNot yet funded — this family needs a first sponsor
$Tear out wet paneling, bag for disposal - Cat 3· 104 SF
Tear out wet paneling, bag for disposal - Cat 3
$134 totalNot yet funded — this family needs a first sponsor
$Apply plant-based anti-microbial agent· 322.39 SF
Apply plant-based anti-microbial agent to more than the walls and ceiling
$136 totalNot yet funded — this family needs a first sponsor
$Seal (1 coat) & paint (1 coat) baseboard· 40.5 LF
Seal (1 coat) & paint (1 coat) baseboard
$139 totalNot yet funded — this family needs a first sponsor
$Containment Barrier/Airlock/Decon. Chamber· 104 SF
Containment Barrier/Airlock/Decon. Chamber
$139 totalNot yet funded — this family needs a first sponsor
$Texture drywall· 37 SF
Texture drywall - smooth / skim coat
$143 totalNot yet funded — this family needs a first sponsor
$Paint door/window trim & jamb· 2 EA
Paint door/window trim & jamb - 2 coats (per side)
$143 totalNot yet funded — this family needs a first sponsor
$Paint door/window trim & jamb· 2 EA
Paint door/window trim & jamb - 2 coats (per side)
$143 totalNot yet funded — this family needs a first sponsor
$Scrape part of the walls & prep for paint· 97.33 SF
Scrape part of the walls & prep for paint
$144 totalNot yet funded — this family needs a first sponsor
$Clean floor or roof joist system· 84.92 SF
Clean floor or roof joist system
$145 totalNot yet funded — this family needs a first sponsor
$Seal (1 coat) & paint (1 coat) trim· 44.5 LF
Seal (1 coat) & paint (1 coat) trim
$146 totalNot yet funded — this family needs a first sponsor
$Paint the ceiling· 98 SF
Paint the ceiling - one coat
$148 totalNot yet funded — this family needs a first sponsor
$Texture drywall· 39.19 SF
Texture drywall - smooth / skim coat
$152 totalNot yet funded — this family needs a first sponsor
$Trim board· 24.83 LF
Trim board - 1/2" x 4" - installed (pine)
$152 totalNot yet funded — this family needs a first sponsor
$Floor protection· 154.58 SF
Floor protection - heavy paper and tape
$152 totalNot yet funded — this family needs a first sponsor
$Seal (1 coat) & paint (1 coat) baseboard· 44.5 LF
Seal (1 coat) & paint (1 coat) baseboard
$153 totalNot yet funded — this family needs a first sponsor
$Seam carpet· 12.25 LF
Seam carpet
$161 totalNot yet funded — this family needs a first sponsor
$Underlayment· 39.19 SF
Underlayment - 1/2" OSB
$161 totalNot yet funded — this family needs a first sponsor
$Tear out and bag wet insulation· 98 SF
Tear out and bag wet insulation Category 3 water
$161 totalNot yet funded — this family needs a first sponsor
$Baseboard· 24.83 LF
Baseboard - 3 1/4"
$162 totalNot yet funded — this family needs a first sponsor
$Seal/prime (1 coat) then paint (1 coat) the ceiling· 76.33 SF
Seal/prime (1 coat) then paint (1 coat) the ceiling
$163 totalNot yet funded — this family needs a first sponsor
$Tear out and bag wet insulation - Category 3 water· 104 SF
Tear out and bag wet insulation - Category 3 water
$164 totalNot yet funded — this family needs a first sponsor
$Mask and prep for paint· 55 LF
Mask and prep for paint - plastic, paper, tape (per LF)
$165 totalNot yet funded — this family needs a first sponsor
$Tear out wet drywall, no bagging - Cat 3· 98 SF
Tear out wet drywall, no bagging - Cat 3
$167 totalNot yet funded — this family needs a first sponsor
$Vanity· 2.5 LF
Vanity - Reset
$171 totalNot yet funded — this family needs a first sponsor
$Asbestos test fee - full service survey - per sample· 5 EA
Asbestos test fee - full service survey - per sample
$175 totalNot yet funded — this family needs a first sponsor
$Apply plant-based anti-microbial agent· 416.17 SF
Apply plant-based anti-microbial agent to more than the walls and ceiling
$176 totalNot yet funded — this family needs a first sponsor
$Water line copper cap/plug· 4 EA
Water line copper cap/plug - per cap
$180 totalNot yet funded — this family needs a first sponsor
$Seal (1 coat) & paint (1 coat) baseboard· 52.58 LF
Seal (1 coat) & paint (1 coat) baseboard
$180 totalNot yet funded — this family needs a first sponsor
$Caulking· 30.5 LF
Caulking - silicone
$181 totalNot yet funded — this family needs a first sponsor
$Seal/prime (1 coat) then paint (1 coat) the ceiling· 84.92 SF
Seal/prime (1 coat) then paint (1 coat) the ceiling
$182 totalNot yet funded — this family needs a first sponsor
$Clean the walls· 291.33 SF
Clean the walls
$183 totalNot yet funded — this family needs a first sponsor
$Baseboard· 30.5 LF
Baseboard - 3 1/4"
$199 totalNot yet funded — this family needs a first sponsor
$Clean stud wall - Heavy· 104 SF
Clean stud wall - Heavy
$199 totalNot yet funded — this family needs a first sponsor
$Respirator cartridge - HEPA only· 6 EA
Respirator cartridge - HEPA only (per pair)
$201 totalNot yet funded — this family needs a first sponsor
$Dehumidifier (per 24 hr period)- up to 69 ppd- No monitor.· 3 EA
Dehumidifier (per 24 hr period)- up to 69 ppd- No monitor.
$201 totalNot yet funded — this family needs a first sponsor
$Dehumidifier (per 24 hr period)- up to 69 ppd- No monitor.· 3 EA
Dehumidifier (per 24 hr period)- up to 69 ppd- No monitor.
$201 totalNot yet funded — this family needs a first sponsor
$Dehumidifier (per 24 hr period)- up to 69 ppd- No monitor.· 3 EA
Dehumidifier (per 24 hr period)- up to 69 ppd- No monitor.
$201 totalNot yet funded — this family needs a first sponsor
$Dehumidifier (per 24 hr period)- up to 69 ppd- No monitor.· 3 EA
Dehumidifier (per 24 hr period)- up to 69 ppd- No monitor.
$201 totalNot yet funded — this family needs a first sponsor
$Dehumidifier (per 24 hr period)- up to 69 ppd- No monitor.· 3 EA
Dehumidifier (per 24 hr period)- up to 69 ppd- No monitor.
$201 totalNot yet funded — this family needs a first sponsor
$Dehumidifier (per 24 hr period)- up to 69 ppd- No monitor.· 3 EA
Dehumidifier (per 24 hr period)- up to 69 ppd- No monitor.
$201 totalNot yet funded — this family needs a first sponsor
$Paint the ceiling· 134.94 SF
Paint the ceiling - one coat
$203 totalNot yet funded — this family needs a first sponsor
$Angle stop valve· 3 EA
Angle stop valve
$204 totalNot yet funded — this family needs a first sponsor
$Scrape part of the walls & prep for paint· 138.33 SF
Scrape part of the walls & prep for paint
$205 totalNot yet funded — this family needs a first sponsor
$Containment Barrier/Airlock/Decon. Chamber· 154.58 SF
Containment Barrier/Airlock/Decon. Chamber
$207 totalNot yet funded — this family needs a first sponsor
$Scrape part of the walls & prep for paint· 140 SF
Scrape part of the walls & prep for paint
$208 totalNot yet funded — this family needs a first sponsor
$Seal/prime (1 coat) then paint (1 coat) the ceiling· 98 SF
Seal/prime (1 coat) then paint (1 coat) the ceiling
$210 totalNot yet funded — this family needs a first sponsor
$Apply plant-based anti-microbial agent· 487.33 SF
Apply plant-based anti-microbial agent to more than the walls and ceiling
$211 totalNot yet funded — this family needs a first sponsor
$Paint door/window trim & jamb· 3 EA
Paint door/window trim & jamb - 2 coats (per side)
$215 totalNot yet funded — this family needs a first sponsor
$Drywall patch / small repair
Drywall patch / small repair, ready for paint 3 SF of drywall patch above the hall entry
$216 totalNot yet funded — this family needs a first sponsor
$Vanity with countertop· 2.5 LF
Vanity with countertop - Reset
$218 totalNot yet funded — this family needs a first sponsor
$Tear out wet drywall, no bagging - Cat 3· 134.94 SF
Tear out wet drywall, no bagging - Cat 3
$230 totalNot yet funded — this family needs a first sponsor
$5/8" drywall· 37 SF
5/8" drywall - hung, taped, ready for texture
$231 totalNot yet funded — this family needs a first sponsor
$Containment Barrier/Airlock/Decon. Chamber· 172.92 SF
Containment Barrier/Airlock/Decon. Chamber
$232 totalNot yet funded — this family needs a first sponsor
$Baseboard· 40.5 LF
Baseboard - 2 1/4"
$232 totalNot yet funded — this family needs a first sponsor
$Paint the ceiling· 154.58 SF
Paint the ceiling - one coat
$233 totalNot yet funded — this family needs a first sponsor
$Add for HEPA filter
Add for HEPA filter (for negative air exhaust fan)
$235 totalNot yet funded — this family needs a first sponsor
$Add for HEPA filter
Add for HEPA filter (for negative air exhaust fan)
$235 totalNot yet funded — this family needs a first sponsor
$Apply plant-based anti-microbial agent· 559.22 SF
Apply plant-based anti-microbial agent to more than the walls and ceiling
$236 totalNot yet funded — this family needs a first sponsor
$Haul debris
Haul debris - per pickup truck load - including dump fees
$237 totalNot yet funded — this family needs a first sponsor
$Sand exposed framing - Floor· 76.33 SF
Sand exposed framing - Floor
$237 totalNot yet funded — this family needs a first sponsor
$Batt insulation· 76.33 SF
Batt insulation - 10" - R30 - unfaced batt
$240 totalNot yet funded — this family needs a first sponsor
$Clean the walls· 383.89 SF
Clean the walls
$241 totalNot yet funded — this family needs a first sponsor
$Sand exposed framing - Floor & Ceiling· 78.39 SF
Sand exposed framing - Floor & Ceiling
$243 totalNot yet funded — this family needs a first sponsor
$Tear out and bag wet insulation - Category 3 water· 154.58 SF
Tear out and bag wet insulation - Category 3 water
$243 totalNot yet funded — this family needs a first sponsor
$5/8" drywall· 39.19 SF
5/8" drywall - hung, taped, ready for texture
$245 totalNot yet funded — this family needs a first sponsor
$Trim board· 40.5 LF
Trim board - 1/2" x 4" - installed (pine)
$247 totalNot yet funded — this family needs a first sponsor
$Tear out wet paneling, bag for disposal - Cat 3· 192 SF
Tear out wet paneling, bag for disposal - Cat 3
$248 totalNot yet funded — this family needs a first sponsor
$Negative air fan/Air scrubber (24 hr period)· 3 EA
Negative air fan/Air scrubber (24 hr period) - No monit.
$251 totalNot yet funded — this family needs a first sponsor
$Negative air fan/Air scrubber (24 hr period)· 3 EA
Negative air fan/Air scrubber (24 hr period) - No monit.
$251 totalNot yet funded — this family needs a first sponsor
$Negative air fan/Air scrubber (24 hr period)· 3 EA
Negative air fan/Air scrubber (24 hr period) - No monit.
$251 totalNot yet funded — this family needs a first sponsor
$Negative air fan/Air scrubber (24 hr period)· 3 EA
Negative air fan/Air scrubber (24 hr period) - No monit.
$251 totalNot yet funded — this family needs a first sponsor
$Negative air fan/Air scrubber (24 hr period)· 3 EA
Negative air fan/Air scrubber (24 hr period) - No monit.
$251 totalNot yet funded — this family needs a first sponsor
$Negative air fan/Air scrubber (24 hr period)· 3 EA
Negative air fan/Air scrubber (24 hr period) - No monit.
$251 totalNot yet funded — this family needs a first sponsor
$Detach & Reset Range
Detach & Reset Range - freestanding - gas
$254 totalNot yet funded — this family needs a first sponsor
$Trim board· 42 LF
Trim board - 1/2" x 4" - installed (pine)
$256 totalNot yet funded — this family needs a first sponsor
$Clean stud wall· 192 SF
Clean stud wall
$262 totalNot yet funded — this family needs a first sponsor
$Tear out wet drywall, no bagging - Cat 3· 154.58 SF
Tear out wet drywall, no bagging - Cat 3
$264 totalNot yet funded — this family needs a first sponsor
$Seal & paint paneling· 104 SF
Seal & paint paneling
$277 totalNot yet funded — this family needs a first sponsor
$Toilet
Toilet - Reset
$283 totalNot yet funded — this family needs a first sponsor
$Tear out and bag wet insulation - Category 3 water· 172.92 SF
Tear out and bag wet insulation - Category 3 water
$285 totalNot yet funded — this family needs a first sponsor
$Install Range
Install Range - freestanding - gas
$286 totalNot yet funded — this family needs a first sponsor
$Paint door/window trim & jamb· 4 EA
Paint door/window trim & jamb - 2 coats (per side)
$287 totalNot yet funded — this family needs a first sponsor
$Seal & paint paneling· 108 SF
Seal & paint paneling
$288 totalNot yet funded — this family needs a first sponsor
$Seal/prime (1 coat) then paint (1 coat) the ceiling· 134.94 SF
Seal/prime (1 coat) then paint (1 coat) the ceiling
$289 totalNot yet funded — this family needs a first sponsor
$Sand exposed framing - Floor· 84.92 SF
Sand exposed framing - Floor
$289 totalNot yet funded — this family needs a first sponsor
$Scrape part of the walls & prep for paint· 195.67 SF
Scrape part of the walls & prep for paint
$290 totalNot yet funded — this family needs a first sponsor
$Apply plant-based anti-microbial agent· 693.04 SF
Apply plant-based anti-microbial agent to more than the walls and ceiling
$292 totalNot yet funded — this family needs a first sponsor
$R&R Baseboard· 44.5 LF
R&R Baseboard - 2 1/4"
$295 totalNot yet funded — this family needs a first sponsor
$Tear out wet drywall, no bagging - Cat 3· 172.92 SF
Tear out wet drywall, no bagging - Cat 3
$295 totalNot yet funded — this family needs a first sponsor
$Texture drywall· 76.33 SF
Texture drywall - smooth / skim coat
$295 totalNot yet funded — this family needs a first sponsor
$Paint door/window trim & jamb· 4 EA
Paint door/window trim & jamb - Large - 2 coats (per side)
$299 totalNot yet funded — this family needs a first sponsor
$Add for personal protective equipment· 12 EA
Add for personal protective equipment (hazardous cleanup)
$303 totalNot yet funded — this family needs a first sponsor
$HEPA Vacuuming - Detailed· 272.67 SF
HEPA Vacuuming - Detailed - (PER SF)
$306 totalNot yet funded — this family needs a first sponsor
$Batt insulation· 98 SF
Batt insulation - 10" - R30 - unfaced batt
$308 totalNot yet funded — this family needs a first sponsor
$Paint door/window trim & jamb· 4 EA
Paint door/window trim & jamb - Large - 2 coats (per side)
$312 totalNot yet funded — this family needs a first sponsor
$HEPA Vacuuming - Detailed· 286.38 SF
HEPA Vacuuming - Detailed - (PER SF) 1st pass
$321 totalNot yet funded — this family needs a first sponsor
$Scrape the walls & prep for paint· 218.89 SF
Scrape the walls & prep for paint
$325 totalNot yet funded — this family needs a first sponsor
$Texture drywall· 84.92 SF
Texture drywall - smooth / skim coat
$329 totalNot yet funded — this family needs a first sponsor
$Seal/prime (1 coat) then paint (1 coat) the ceiling· 154.58 SF
Seal/prime (1 coat) then paint (1 coat) the ceiling
$331 totalNot yet funded — this family needs a first sponsor
$HEPA Vacuuming - Detailed· 295.22 SF
HEPA Vacuuming - Detailed - (PER SF)
$331 totalNot yet funded — this family needs a first sponsor
$Sand exposed framing - Floor· 98 SF
Sand exposed framing - Floor
$334 totalNot yet funded — this family needs a first sponsor
$Clean floor or roof joist system· 196 SF
Clean floor or roof joist system
$335 totalNot yet funded — this family needs a first sponsor
$Equipment setup, take down, and monitoring· 4 HR
Equipment setup, take down, and monitoring (hourly charge)
$340 totalNot yet funded — this family needs a first sponsor
$HEPA Vacuuming - Detailed· 309.15 SF
HEPA Vacuuming - Detailed - (PER SF)
$346 totalNot yet funded — this family needs a first sponsor
$Paint door/window trim & jamb· 5 EA
Paint door/window trim & jamb - 2 coats (per side)
$358 totalNot yet funded — this family needs a first sponsor
$Batt insulation· 143.19 SF
Batt insulation - 6" - R19 - unfaced batt
$363 totalNot yet funded — this family needs a first sponsor
$Paint paneling· 195.67 SF
Paint paneling - one coat
$364 totalNot yet funded — this family needs a first sponsor
$HEPA Vacuuming - Detailed· 331.25 SF
HEPA Vacuuming - Detailed - (PER SF)
$371 totalNot yet funded — this family needs a first sponsor
$Post-Remediation Verification / air clearance- per sample· 5 EA
Post-Remediation Verification / air clearance- per sample
$375 totalNot yet funded — this family needs a first sponsor
$Texture drywall· 98 SF
Texture drywall - smooth / skim coat
$379 totalNot yet funded — this family needs a first sponsor
$R&R Baseboard· 52.58 LF
R&R Baseboard - 3 1/4"
$395 totalNot yet funded — this family needs a first sponsor
$Paint paneling· 218.89 SF
Paint paneling - one coat
$407 totalNot yet funded — this family needs a first sponsor
$Tear out non-salv vinyl, cut & bag - Category 3 water· 134.94 SF
Tear out non-salv vinyl, cut & bag - Category 3 water
$429 totalNot yet funded — this family needs a first sponsor
$Scrape the walls & prep for paint· 291.33 SF
Scrape the walls & prep for paint
$432 totalNot yet funded — this family needs a first sponsor
$Containment Barrier/Airlock/Decon. Chamber· 326.94 SF
Containment Barrier/Airlock/Decon. Chamber
$438 totalNot yet funded — this family needs a first sponsor
$Asbestos test fee full service survey - base fee
Asbestos test fee full service survey - base fee
$450 totalNot yet funded — this family needs a first sponsor
$Paint paneling· 244 SF
Paint paneling - one coat
$453 totalNot yet funded — this family needs a first sponsor
$Sink· 2 EA
Sink - single - Reset
$457 totalNot yet funded — this family needs a first sponsor
$Paint paneling· 246.33 SF
Paint paneling - one coat
$458 totalNot yet funded — this family needs a first sponsor
$Sand exposed framing - Floor· 134.94 SF
Sand exposed framing - Floor
$459 totalNot yet funded — this family needs a first sponsor
$Clean floor or roof joist system· 269.89 SF
Clean floor or roof joist system
$461 totalNot yet funded — this family needs a first sponsor
$5/8" drywall· 76.33 SF
5/8" drywall - hung, taped, ready for texture
$477 totalNot yet funded — this family needs a first sponsor
$Batt insulation· 154.58 SF
Batt insulation - 10" - R30 - unfaced batt
$485 totalNot yet funded — this family needs a first sponsor
$Tear out non-salv vinyl, cut & bag - Category 3 water· 154.58 SF
Tear out non-salv vinyl, cut & bag - Category 3 water
$491 totalNot yet funded — this family needs a first sponsor
$Paneling· 104 SF
Paneling
$497 totalNot yet funded — this family needs a first sponsor
$Batt insulation· 192.92 SF
Batt insulation - 10" - R30 - unfaced batt
$516 totalNot yet funded — this family needs a first sponsor
$HEPA Vacuuming - Detailed· 461.89 SF
HEPA Vacuuming - Detailed - (PER SF)
$518 totalNot yet funded — this family needs a first sponsor
$Seal & paint paneling· 195.67 SF
Seal & paint paneling
$522 totalNot yet funded — this family needs a first sponsor
$Texture drywall· 134.94 SF
Texture drywall - smooth / skim coat
$522 totalNot yet funded — this family needs a first sponsor
$Vinyl plank flooring· 39.19 SF
Vinyl plank flooring
$528 totalNot yet funded — this family needs a first sponsor
$Clean floor or roof joist system· 309.15 SF
Clean floor or roof joist system
$528 totalNot yet funded — this family needs a first sponsor
$5/8" drywall· 84.92 SF
5/8" drywall - hung, taped, ready for texture
$531 totalNot yet funded — this family needs a first sponsor
$Paint paneling· 289.33 SF
Paint paneling - one coat
$538 totalNot yet funded — this family needs a first sponsor
$Tear out and bag wet insulation - Category 3 water· 326.94 SF
Tear out and bag wet insulation - Category 3 water
$538 totalNot yet funded — this family needs a first sponsor
$Paint paneling· 291.33 SF
Paint paneling - one coat
$541 totalNot yet funded — this family needs a first sponsor
$HEPA Vacuuming - Detailed· 487.33 SF
HEPA Vacuuming - Detailed - (PER SF)
$546 totalNot yet funded — this family needs a first sponsor
$Haul debris· 2 EA
Haul debris - per pickup truck load - including dump fees
$568 totalNot yet funded — this family needs a first sponsor
$Scrape the walls & prep for paint· 383.89 SF
Scrape the walls & prep for paint
$569 totalNot yet funded — this family needs a first sponsor
$Wood floor covering labor minimum
Wood floor covering labor minimum
$582 totalNot yet funded — this family needs a first sponsor
$Seal & paint paneling· 218.89 SF
Seal & paint paneling
$584 totalNot yet funded — this family needs a first sponsor
$Texture drywall· 154.58 SF
Texture drywall - smooth / skim coat
$598 totalNot yet funded — this family needs a first sponsor
$5/8" drywall· 98 SF
5/8" drywall - hung, taped, ready for texture
$612 totalNot yet funded — this family needs a first sponsor
$Underlayment - 1/2" OSB· 154.58 SF
Underlayment - 1/2" OSB
$635 totalNot yet funded — this family needs a first sponsor
$Equipment decontamination charge· 13 EA
Equipment decontamination charge - per piece of equipment
$640 totalNot yet funded — this family needs a first sponsor
$1/2" drywall· 108 SF
1/2" drywall - hung, taped, ready for texture
$651 totalNot yet funded — this family needs a first sponsor
$General Laborer· 8 HR
General Laborer - per hour *condo access; to haul material and equipment up to unit; to haul equipment and debris down to truck/ van; clean common hallways.
$679 totalNot yet funded — this family needs a first sponsor
$General clean - up· 8 HR
General clean - up *This item is intended for general post construction clean-up.
$709 totalNot yet funded — this family needs a first sponsor
$Carpet· 112.7 SF
Carpet 15% waste added for Carpet.
$743 totalNot yet funded — this family needs a first sponsor
$Paint part of the walls· 345.5 SF
Paint part of the walls - two coats
$754 totalNot yet funded — this family needs a first sponsor
$Seal & paint paneling· 289.33 SF
Seal & paint paneling
$772 totalNot yet funded — this family needs a first sponsor
$Seal & paint paneling· 291.33 SF
Seal & paint paneling
$777 totalNot yet funded — this family needs a first sponsor
$Batt insulation· 326.94 SF
Batt insulation - 4" - R13 - unfaced batt
$788 totalNot yet funded — this family needs a first sponsor
$5/8" drywall· 134.94 SF
5/8" drywall - hung, taped, ready for texture
$843 totalNot yet funded — this family needs a first sponsor
$Paneling· 192 SF
Paneling
$917 totalNot yet funded — this family needs a first sponsor
$Sand exposed framing - Floor & ceiling· 309.15 SF
Sand exposed framing - Floor & ceiling Sub floor
$959 totalNot yet funded — this family needs a first sponsor
$5/8" drywall· 154.58 SF
5/8" drywall - hung, taped, ready for texture
$966 totalNot yet funded — this family needs a first sponsor
$R&R Floating subfloor· 154.58 SF
R&R Floating subfloor
$982 totalNot yet funded — this family needs a first sponsor
$R&R Underlayment· 134.94 SF
R&R Underlayment - 1/2" OSB
$1,112 totalNot yet funded — this family needs a first sponsor
$Vinyl plank flooring· 134.94 SF
Vinyl plank flooring
$1,817 totalNot yet funded — this family needs a first sponsor
$Vinyl plank flooring· 154.58 SF
Vinyl plank flooring
$2,082 totalNot yet funded — this family needs a first sponsor
$
Every dollar is traceable.
100% reaches this family. Ohana Restore takes nothing from your gift.
Every item is tracked. From your gift to the day it is installed in the home.
Funds release only after three approvals. The family, the nonprofit, and the contractor.
Leftover funds stay with flood survivors.
The floods took everything inside these homes — beds, furniture, kitchen essentials, the everyday things that make a house a home. If this family’s rebuild is fully funded, any extra goes toward replacing those belongings — or, at the family’s choosing, helps another ʻohana still waiting. Either way, every dollar stays with a flood survivor.