FAMILY F-010

An ʻohana in Laie,
ready for donors.

Donate now
Their story

A family of 11 sustained drastic damage when the rain caused a big hole in the ceiling and the water came pouring in and flooded the entire living room. Then it traveled through the ceiling to the other rooms creating mold throughout the home. The rain took out some foundation blocks as well. At the same time after the event, they are sheltered 5 families including young children, in tents and with a makeshift outdoor shower after they lost their entire homes to 8 feet of water in them - they opened their land for a safe haven while trying to sort through what to do. All 11 family members are living in an on site 2 bedroom Ohana home on site while waiting for help.

Where this family stands
0%
funded toward a $66,625 rebuild
$0
Raised
$66,625
Still needed
0
Donors

What this ʻohana still needs.

259 items still need funding

Sponsor a whole item, or give part of the way toward a bigger one — add as many as you like, then give once. Or fund everything for this family in one click.

  • Remove P-trap assembly

    Remove P-trap assembly - ABS (plastic)

    $13 total

    Not yet funded — this family needs a first sponsor

    $
  • Remove Light fixture

    Remove Light fixture

    $15 total

    Not yet funded — this family needs a first sponsor

    $
  • Remove Light fixture

    Remove Light fixture

    $15 total

    Not yet funded — this family needs a first sponsor

    $
  • Remove Light fixture

    Remove Light fixture

    $15 total

    Not yet funded — this family needs a first sponsor

    $
  • Personal protective gloves - Disposable· 48 EA

    Personal protective gloves - Disposable (per pair)

    $21 total

    Not yet funded — this family needs a first sponsor

    $
  • Final cleaning· 37 SF

    Final cleaning - construction - Residential

    $21 total

    Not yet funded — this family needs a first sponsor

    $
  • Final cleaning· 39.19 SF

    Final cleaning - construction - Residential

    $22 total

    Not yet funded — this family needs a first sponsor

    $
  • Remove Plumbing fixture supply line· 3 EA

    Remove Plumbing fixture supply line

    $27 total

    Not yet funded — this family needs a first sponsor

    $
  • Remove Angle stop valve· 3 EA

    Remove Angle stop valve

    $27 total

    Not yet funded — this family needs a first sponsor

    $
  • Tear out trim and bag for disposal· 22 LF

    Tear out trim and bag for disposal - up to Cat 3 Crown molding

    $29 total

    Not yet funded — this family needs a first sponsor

    $
  • Tear out baseboard and bag for disposal· 22 LF

    Tear out baseboard and bag for disposal - up to Cat 3

    $29 total

    Not yet funded — this family needs a first sponsor

    $
  • Apply plant-based anti-microbial agent to the floor· 76.33 SF

    Apply plant-based anti-microbial agent to the floor

    $32 total

    Not yet funded — this family needs a first sponsor

    $
  • Vapor barrier· 39.19 SF

    Vapor barrier - visqueen - 6mil

    $36 total

    Not yet funded — this family needs a first sponsor

    $
  • Remove Sink faucet - Bathroom

    Remove Sink faucet - Bathroom

    $36 total

    Not yet funded — this family needs a first sponsor

    $
  • Floor protection· 37 SF

    Floor protection - heavy paper and tape

    $36 total

    Not yet funded — this family needs a first sponsor

    $
  • Clean floor - Heavy· 37 SF

    Clean floor - Heavy

    $38 total

    Not yet funded — this family needs a first sponsor

    $
  • Floor protection· 39.19 SF

    Floor protection - heavy paper and tape

    $39 total

    Not yet funded — this family needs a first sponsor

    $
  • Final cleaning· 76.33 SF

    Final cleaning - construction - Residential

    $43 total

    Not yet funded — this family needs a first sponsor

    $
  • Sink - single basin - Detach

    Sink - single basin - Detach

    $45 total

    Not yet funded — this family needs a first sponsor

    $
  • Respirator - Full face - multi-purpose resp.· 6 EA

    Respirator - Full face - multi-purpose resp. (per day)

    $48 total

    Not yet funded — this family needs a first sponsor

    $
  • Clean the ceiling· 76.33 SF

    Clean the ceiling

    $48 total

    Not yet funded — this family needs a first sponsor

    $
  • Final cleaning· 84.92 SF

    Final cleaning - construction - Residential

    $48 total

    Not yet funded — this family needs a first sponsor

    $
  • Containment Barrier/Airlock/Decon. Chamber· 37 SF

    Containment Barrier/Airlock/Decon. Chamber

    $50 total

    Not yet funded — this family needs a first sponsor

    $
  • Paint baseboard· 24.83 LF

    Paint baseboard - one coat

    $55 total

    Not yet funded — this family needs a first sponsor

    $
  • Paint trim· 24.83 LF

    Paint trim - one coat

    $55 total

    Not yet funded — this family needs a first sponsor

    $
  • Final cleaning· 98 SF

    Final cleaning - construction - Residential

    $55 total

    Not yet funded — this family needs a first sponsor

    $
  • Clean floor· 76.33 SF

    Clean floor

    $56 total

    Not yet funded — this family needs a first sponsor

    $
  • Tear out trim and bag for disposal· 40.5 LF

    Tear out trim and bag for disposal Crown molding

    $56 total

    Not yet funded — this family needs a first sponsor

    $
  • Tear out trim and bag for disposal· 42 LF

    Tear out trim and bag for disposal Crown Molding

    $58 total

    Not yet funded — this family needs a first sponsor

    $
  • Add for HEPA filter

    Add for HEPA filter (for negative air exhaust fan)

    $59 total

    Not yet funded — this family needs a first sponsor

    $
  • Add for HEPA filter

    Add for HEPA filter (for negative air exhaust fan)

    $59 total

    Not yet funded — this family needs a first sponsor

    $
  • Add for HEPA filter

    Add for HEPA filter (for negative air exhaust fan)

    $59 total

    Not yet funded — this family needs a first sponsor

    $
  • Add for HEPA filter

    Add for HEPA filter (for negative air exhaust fan)

    $59 total

    Not yet funded — this family needs a first sponsor

    $
  • Paint the ceiling· 39.19 SF

    Paint the ceiling - one coat

    $59 total

    Not yet funded — this family needs a first sponsor

    $
  • Paint more than the ceiling· 40 SF

    Paint more than the ceiling - one coat

    $60 total

    Not yet funded — this family needs a first sponsor

    $
  • Tear out and bag wet insulation - Category 3 water· 37 SF

    Tear out and bag wet insulation - Category 3 water

    $61 total

    Not yet funded — this family needs a first sponsor

    $
  • Clean the surface area· 97.33 SF

    Clean the surface area Unaffected wall

    $61 total

    Not yet funded — this family needs a first sponsor

    $
  • Clean floor· 84.92 SF

    Clean floor

    $62 total

    Not yet funded — this family needs a first sponsor

    $
  • Tear out wet drywall, no bagging - Cat 3· 37 SF

    Tear out wet drywall, no bagging - Cat 3

    $63 total

    Not yet funded — this family needs a first sponsor

    $
  • Clean floor or roof joist system· 37 SF

    Clean floor or roof joist system

    $63 total

    Not yet funded — this family needs a first sponsor

    $
  • Clean floor or roof joist system· 39.19 SF

    Clean floor or roof joist system

    $67 total

    Not yet funded — this family needs a first sponsor

    $
  • Paint baseboard· 30.5 LF

    Paint baseboard - one coat

    $67 total

    Not yet funded — this family needs a first sponsor

    $
  • Tackless strip· 40.5 LF

    Tackless strip - per LF

    $70 total

    Not yet funded — this family needs a first sponsor

    $
  • Paint paneling· 38.39 SF

    Paint paneling - one coat

    $71 total

    Not yet funded — this family needs a first sponsor

    $
  • Seal & paint wood shelving· 7 LF

    Seal & paint wood shelving, 12"-24" width

    $72 total

    Not yet funded — this family needs a first sponsor

    $
  • Mask and prep for paint· 24.83 LF

    Mask and prep for paint - plastic, paper, tape (per LF)

    $75 total

    Not yet funded — this family needs a first sponsor

    $
  • Water line copper cap/plug· 2 EA

    Water line copper cap/plug - per cap

    $75 total

    Not yet funded — this family needs a first sponsor

    $
  • Floor protection· 76.33 SF

    Floor protection - heavy paper and tape

    $75 total

    Not yet funded — this family needs a first sponsor

    $
  • Toilet - Detach

    Toilet - Detach

    $76 total

    Not yet funded — this family needs a first sponsor

    $
  • Final cleaning· 134.94 SF

    Final cleaning - construction - Residential

    $76 total

    Not yet funded — this family needs a first sponsor

    $
  • R&R Plumbing fixture supply line· 2 EA

    R&R Plumbing fixture supply line

    $78 total

    Not yet funded — this family needs a first sponsor

    $
  • Tear out tackless strip and bag for disposal - Category 3· 42 LF

    Tear out tackless strip and bag for disposal - Category 3

    $80 total

    Not yet funded — this family needs a first sponsor

    $
  • Seal (1 coat) & paint (1 coat) trim· 24.83 LF

    Seal (1 coat) & paint (1 coat) trim

    $81 total

    Not yet funded — this family needs a first sponsor

    $
  • Seal/prime (1 coat) then paint (1 coat) the ceiling· 39.19 SF

    Seal/prime (1 coat) then paint (1 coat) the ceiling

    $84 total

    Not yet funded — this family needs a first sponsor

    $
  • Seal (1 coat) & paint (1 coat) baseboard· 24.83 LF

    Seal (1 coat) & paint (1 coat) baseboard

    $85 total

    Not yet funded — this family needs a first sponsor

    $
  • Seal/prime (1 coat) then paint (1 coat) more than the ceiling· 40 SF

    Seal/prime (1 coat) then paint (1 coat) more than the ceiling

    $86 total

    Not yet funded — this family needs a first sponsor

    $
  • Final cleaning· 154.58 SF

    Final cleaning - construction - Residential

    $87 total

    Not yet funded — this family needs a first sponsor

    $
  • Stain & finish base shoe or quarter round· 30.5 LF

    Stain & finish base shoe or quarter round

    $88 total

    Not yet funded — this family needs a first sponsor

    $
  • Paint trim· 40.5 LF

    Paint trim - one coat

    $89 total

    Not yet funded — this family needs a first sponsor

    $
  • Paint baseboard· 40.5 LF

    Paint baseboard - one coat

    $89 total

    Not yet funded — this family needs a first sponsor

    $
  • Mask and prep for paint· 30.5 LF

    Mask and prep for paint - plastic, paper, tape (per LF)

    $92 total

    Not yet funded — this family needs a first sponsor

    $
  • Quarter round· 30.5 LF

    Quarter round - 3/4"

    $95 total

    Not yet funded — this family needs a first sponsor

    $
  • P-trap assembly - Detach & reset

    P-trap assembly - Detach & reset

    $95 total

    Not yet funded — this family needs a first sponsor

    $
  • Floor protection· 98 SF

    Floor protection - heavy paper and tape

    $96 total

    Not yet funded — this family needs a first sponsor

    $
  • Mask and prep for paint· 32.17 LF

    Mask and prep for paint - plastic, paper, tape (per LF)

    $97 total

    Not yet funded — this family needs a first sponsor

    $
  • Paint baseboard· 44.5 LF

    Paint baseboard - one coat

    $98 total

    Not yet funded — this family needs a first sponsor

    $
  • Paint trim· 44.5 LF

    Paint trim - one coat

    $98 total

    Not yet funded — this family needs a first sponsor

    $
  • Clean part of the walls· 158.33 SF

    Clean part of the walls

    $100 total

    Not yet funded — this family needs a first sponsor

    $
  • Seal & paint paneling· 38.39 SF

    Seal & paint paneling

    $102 total

    Not yet funded — this family needs a first sponsor

    $
  • Install P-trap assembly

    Install P-trap assembly - ABS (plastic)

    $103 total

    Not yet funded — this family needs a first sponsor

    $
  • Floor protection· 54 SF

    Floor protection - cloth - skid resistant, breathable

    $104 total

    Not yet funded — this family needs a first sponsor

    $
  • Seal (1 coat) & paint (1 coat) baseboard· 30.5 LF

    Seal (1 coat) & paint (1 coat) baseboard

    $105 total

    Not yet funded — this family needs a first sponsor

    $
  • Detach & Reset Smoke detector

    Detach & Reset Smoke detector

    $105 total

    Not yet funded — this family needs a first sponsor

    $
  • Add for HEPA filter

    Add for HEPA filter (for canister/backpack vacuums)

    $105 total

    Not yet funded — this family needs a first sponsor

    $
  • Plumbing fixture supply line· 3 EA

    Plumbing fixture supply line

    $108 total

    Not yet funded — this family needs a first sponsor

    $
  • Clean part of the walls and ceiling· 179.19 SF

    Clean part of the walls and ceiling

    $113 total

    Not yet funded — this family needs a first sponsor

    $
  • Carpet pad· 98 SF

    Carpet pad

    $113 total

    Not yet funded — this family needs a first sponsor

    $
  • P-trap assembly

    P-trap assembly - ABS (plastic)

    $114 total

    Not yet funded — this family needs a first sponsor

    $
  • Paint the ceiling· 76.33 SF

    Paint the ceiling - one coat

    $115 total

    Not yet funded — this family needs a first sponsor

    $
  • Apply plant-based anti-microbial agent· 272.67 SF

    Apply plant-based anti-microbial agent to more than the walls and ceiling

    $115 total

    Not yet funded — this family needs a first sponsor

    $
  • Paint baseboard· 52.58 LF

    Paint baseboard - one coat

    $116 total

    Not yet funded — this family needs a first sponsor

    $
  • Batt insulation· 37 SF

    Batt insulation - 10" - R30 - unfaced batt

    $116 total

    Not yet funded — this family needs a first sponsor

    $
  • Clean stud wall· 88 SF

    Clean stud wall

    $120 total

    Not yet funded — this family needs a first sponsor

    $
  • Mask and prep for paint· 40.5 LF

    Mask and prep for paint - plastic, paper, tape (per LF)

    $122 total

    Not yet funded — this family needs a first sponsor

    $
  • Carpet labor minimum

    Carpet labor minimum

    $124 total

    Not yet funded — this family needs a first sponsor

    $
  • Sink faucet

    Sink faucet - Detach & reset Reset

    $124 total

    Not yet funded — this family needs a first sponsor

    $
  • Tear out non-salv vinyl, cut & bag - Category 3 water· 39.19 SF

    Tear out non-salv vinyl, cut & bag - Category 3 water

    $124 total

    Not yet funded — this family needs a first sponsor

    $
  • Tear out wet carpet pad, cut/bag - Category 3 water· 98 SF

    Tear out wet carpet pad, cut/bag - Category 3 water

    $125 total

    Not yet funded — this family needs a first sponsor

    $
  • Sand exposed framing - Floor· 37 SF

    Sand exposed framing - Floor

    $126 total

    Not yet funded — this family needs a first sponsor

    $
  • Paint the ceiling· 84.92 SF

    Paint the ceiling - one coat

    $128 total

    Not yet funded — this family needs a first sponsor

    $
  • Containment Barrier/Airlock/Decon. Chamber· 98 SF

    Containment Barrier/Airlock/Decon. Chamber

    $131 total

    Not yet funded — this family needs a first sponsor

    $
  • Light fixture

    Light fixture

    $132 total

    Not yet funded — this family needs a first sponsor

    $
  • Light fixture

    Light fixture

    $132 total

    Not yet funded — this family needs a first sponsor

    $
  • Light fixture

    Light fixture

    $132 total

    Not yet funded — this family needs a first sponsor

    $
  • Tear out wet non-salvageable carpet, cut/bag - Cat 3 water· 98 SF

    Tear out wet non-salvageable carpet, cut/bag - Cat 3 water

    $133 total

    Not yet funded — this family needs a first sponsor

    $
  • Seal (1 coat) & paint (1 coat) trim· 40.5 LF

    Seal (1 coat) & paint (1 coat) trim

    $133 total

    Not yet funded — this family needs a first sponsor

    $
  • Floor protection· 134.94 SF

    Floor protection - heavy paper and tape

    $133 total

    Not yet funded — this family needs a first sponsor

    $
  • Vanity - Detach· 3.5 LF

    Vanity - Detach

    $133 total

    Not yet funded — this family needs a first sponsor

    $
  • Mask and prep for paint· 44.5 LF

    Mask and prep for paint - plastic, paper, tape (per LF)

    $134 total

    Not yet funded — this family needs a first sponsor

    $
  • Tear out wet paneling, bag for disposal - Cat 3· 104 SF

    Tear out wet paneling, bag for disposal - Cat 3

    $134 total

    Not yet funded — this family needs a first sponsor

    $
  • Apply plant-based anti-microbial agent· 322.39 SF

    Apply plant-based anti-microbial agent to more than the walls and ceiling

    $136 total

    Not yet funded — this family needs a first sponsor

    $
  • Seal (1 coat) & paint (1 coat) baseboard· 40.5 LF

    Seal (1 coat) & paint (1 coat) baseboard

    $139 total

    Not yet funded — this family needs a first sponsor

    $
  • Containment Barrier/Airlock/Decon. Chamber· 104 SF

    Containment Barrier/Airlock/Decon. Chamber

    $139 total

    Not yet funded — this family needs a first sponsor

    $
  • Texture drywall· 37 SF

    Texture drywall - smooth / skim coat

    $143 total

    Not yet funded — this family needs a first sponsor

    $
  • Paint door/window trim & jamb· 2 EA

    Paint door/window trim & jamb - 2 coats (per side)

    $143 total

    Not yet funded — this family needs a first sponsor

    $
  • Paint door/window trim & jamb· 2 EA

    Paint door/window trim & jamb - 2 coats (per side)

    $143 total

    Not yet funded — this family needs a first sponsor

    $
  • Scrape part of the walls & prep for paint· 97.33 SF

    Scrape part of the walls & prep for paint

    $144 total

    Not yet funded — this family needs a first sponsor

    $
  • Clean floor or roof joist system· 84.92 SF

    Clean floor or roof joist system

    $145 total

    Not yet funded — this family needs a first sponsor

    $
  • Seal (1 coat) & paint (1 coat) trim· 44.5 LF

    Seal (1 coat) & paint (1 coat) trim

    $146 total

    Not yet funded — this family needs a first sponsor

    $
  • Paint the ceiling· 98 SF

    Paint the ceiling - one coat

    $148 total

    Not yet funded — this family needs a first sponsor

    $
  • Texture drywall· 39.19 SF

    Texture drywall - smooth / skim coat

    $152 total

    Not yet funded — this family needs a first sponsor

    $
  • Trim board· 24.83 LF

    Trim board - 1/2" x 4" - installed (pine)

    $152 total

    Not yet funded — this family needs a first sponsor

    $
  • Floor protection· 154.58 SF

    Floor protection - heavy paper and tape

    $152 total

    Not yet funded — this family needs a first sponsor

    $
  • Seal (1 coat) & paint (1 coat) baseboard· 44.5 LF

    Seal (1 coat) & paint (1 coat) baseboard

    $153 total

    Not yet funded — this family needs a first sponsor

    $
  • Seam carpet· 12.25 LF

    Seam carpet

    $161 total

    Not yet funded — this family needs a first sponsor

    $
  • Underlayment· 39.19 SF

    Underlayment - 1/2" OSB

    $161 total

    Not yet funded — this family needs a first sponsor

    $
  • Tear out and bag wet insulation· 98 SF

    Tear out and bag wet insulation Category 3 water

    $161 total

    Not yet funded — this family needs a first sponsor

    $
  • Baseboard· 24.83 LF

    Baseboard - 3 1/4"

    $162 total

    Not yet funded — this family needs a first sponsor

    $
  • Seal/prime (1 coat) then paint (1 coat) the ceiling· 76.33 SF

    Seal/prime (1 coat) then paint (1 coat) the ceiling

    $163 total

    Not yet funded — this family needs a first sponsor

    $
  • Tear out and bag wet insulation - Category 3 water· 104 SF

    Tear out and bag wet insulation - Category 3 water

    $164 total

    Not yet funded — this family needs a first sponsor

    $
  • Mask and prep for paint· 55 LF

    Mask and prep for paint - plastic, paper, tape (per LF)

    $165 total

    Not yet funded — this family needs a first sponsor

    $
  • Tear out wet drywall, no bagging - Cat 3· 98 SF

    Tear out wet drywall, no bagging - Cat 3

    $167 total

    Not yet funded — this family needs a first sponsor

    $
  • Vanity· 2.5 LF

    Vanity - Reset

    $171 total

    Not yet funded — this family needs a first sponsor

    $
  • Asbestos test fee - full service survey - per sample· 5 EA

    Asbestos test fee - full service survey - per sample

    $175 total

    Not yet funded — this family needs a first sponsor

    $
  • Apply plant-based anti-microbial agent· 416.17 SF

    Apply plant-based anti-microbial agent to more than the walls and ceiling

    $176 total

    Not yet funded — this family needs a first sponsor

    $
  • Water line copper cap/plug· 4 EA

    Water line copper cap/plug - per cap

    $180 total

    Not yet funded — this family needs a first sponsor

    $
  • Seal (1 coat) & paint (1 coat) baseboard· 52.58 LF

    Seal (1 coat) & paint (1 coat) baseboard

    $180 total

    Not yet funded — this family needs a first sponsor

    $
  • Caulking· 30.5 LF

    Caulking - silicone

    $181 total

    Not yet funded — this family needs a first sponsor

    $
  • Seal/prime (1 coat) then paint (1 coat) the ceiling· 84.92 SF

    Seal/prime (1 coat) then paint (1 coat) the ceiling

    $182 total

    Not yet funded — this family needs a first sponsor

    $
  • Clean the walls· 291.33 SF

    Clean the walls

    $183 total

    Not yet funded — this family needs a first sponsor

    $
  • Baseboard· 30.5 LF

    Baseboard - 3 1/4"

    $199 total

    Not yet funded — this family needs a first sponsor

    $
  • Clean stud wall - Heavy· 104 SF

    Clean stud wall - Heavy

    $199 total

    Not yet funded — this family needs a first sponsor

    $
  • Respirator cartridge - HEPA only· 6 EA

    Respirator cartridge - HEPA only (per pair)

    $201 total

    Not yet funded — this family needs a first sponsor

    $
  • Dehumidifier (per 24 hr period)- up to 69 ppd- No monitor.· 3 EA

    Dehumidifier (per 24 hr period)- up to 69 ppd- No monitor.

    $201 total

    Not yet funded — this family needs a first sponsor

    $
  • Dehumidifier (per 24 hr period)- up to 69 ppd- No monitor.· 3 EA

    Dehumidifier (per 24 hr period)- up to 69 ppd- No monitor.

    $201 total

    Not yet funded — this family needs a first sponsor

    $
  • Dehumidifier (per 24 hr period)- up to 69 ppd- No monitor.· 3 EA

    Dehumidifier (per 24 hr period)- up to 69 ppd- No monitor.

    $201 total

    Not yet funded — this family needs a first sponsor

    $
  • Dehumidifier (per 24 hr period)- up to 69 ppd- No monitor.· 3 EA

    Dehumidifier (per 24 hr period)- up to 69 ppd- No monitor.

    $201 total

    Not yet funded — this family needs a first sponsor

    $
  • Dehumidifier (per 24 hr period)- up to 69 ppd- No monitor.· 3 EA

    Dehumidifier (per 24 hr period)- up to 69 ppd- No monitor.

    $201 total

    Not yet funded — this family needs a first sponsor

    $
  • Dehumidifier (per 24 hr period)- up to 69 ppd- No monitor.· 3 EA

    Dehumidifier (per 24 hr period)- up to 69 ppd- No monitor.

    $201 total

    Not yet funded — this family needs a first sponsor

    $
  • Paint the ceiling· 134.94 SF

    Paint the ceiling - one coat

    $203 total

    Not yet funded — this family needs a first sponsor

    $
  • Angle stop valve· 3 EA

    Angle stop valve

    $204 total

    Not yet funded — this family needs a first sponsor

    $
  • Scrape part of the walls & prep for paint· 138.33 SF

    Scrape part of the walls & prep for paint

    $205 total

    Not yet funded — this family needs a first sponsor

    $
  • Containment Barrier/Airlock/Decon. Chamber· 154.58 SF

    Containment Barrier/Airlock/Decon. Chamber

    $207 total

    Not yet funded — this family needs a first sponsor

    $
  • Scrape part of the walls & prep for paint· 140 SF

    Scrape part of the walls & prep for paint

    $208 total

    Not yet funded — this family needs a first sponsor

    $
  • Seal/prime (1 coat) then paint (1 coat) the ceiling· 98 SF

    Seal/prime (1 coat) then paint (1 coat) the ceiling

    $210 total

    Not yet funded — this family needs a first sponsor

    $
  • Apply plant-based anti-microbial agent· 487.33 SF

    Apply plant-based anti-microbial agent to more than the walls and ceiling

    $211 total

    Not yet funded — this family needs a first sponsor

    $
  • Paint door/window trim & jamb· 3 EA

    Paint door/window trim & jamb - 2 coats (per side)

    $215 total

    Not yet funded — this family needs a first sponsor

    $
  • Drywall patch / small repair

    Drywall patch / small repair, ready for paint 3 SF of drywall patch above the hall entry

    $216 total

    Not yet funded — this family needs a first sponsor

    $
  • Vanity with countertop· 2.5 LF

    Vanity with countertop - Reset

    $218 total

    Not yet funded — this family needs a first sponsor

    $
  • Tear out wet drywall, no bagging - Cat 3· 134.94 SF

    Tear out wet drywall, no bagging - Cat 3

    $230 total

    Not yet funded — this family needs a first sponsor

    $
  • 5/8" drywall· 37 SF

    5/8" drywall - hung, taped, ready for texture

    $231 total

    Not yet funded — this family needs a first sponsor

    $
  • Containment Barrier/Airlock/Decon. Chamber· 172.92 SF

    Containment Barrier/Airlock/Decon. Chamber

    $232 total

    Not yet funded — this family needs a first sponsor

    $
  • Baseboard· 40.5 LF

    Baseboard - 2 1/4"

    $232 total

    Not yet funded — this family needs a first sponsor

    $
  • Paint the ceiling· 154.58 SF

    Paint the ceiling - one coat

    $233 total

    Not yet funded — this family needs a first sponsor

    $
  • Add for HEPA filter

    Add for HEPA filter (for negative air exhaust fan)

    $235 total

    Not yet funded — this family needs a first sponsor

    $
  • Add for HEPA filter

    Add for HEPA filter (for negative air exhaust fan)

    $235 total

    Not yet funded — this family needs a first sponsor

    $
  • Apply plant-based anti-microbial agent· 559.22 SF

    Apply plant-based anti-microbial agent to more than the walls and ceiling

    $236 total

    Not yet funded — this family needs a first sponsor

    $
  • Haul debris

    Haul debris - per pickup truck load - including dump fees

    $237 total

    Not yet funded — this family needs a first sponsor

    $
  • Sand exposed framing - Floor· 76.33 SF

    Sand exposed framing - Floor

    $237 total

    Not yet funded — this family needs a first sponsor

    $
  • Batt insulation· 76.33 SF

    Batt insulation - 10" - R30 - unfaced batt

    $240 total

    Not yet funded — this family needs a first sponsor

    $
  • Clean the walls· 383.89 SF

    Clean the walls

    $241 total

    Not yet funded — this family needs a first sponsor

    $
  • Sand exposed framing - Floor & Ceiling· 78.39 SF

    Sand exposed framing - Floor & Ceiling

    $243 total

    Not yet funded — this family needs a first sponsor

    $
  • Tear out and bag wet insulation - Category 3 water· 154.58 SF

    Tear out and bag wet insulation - Category 3 water

    $243 total

    Not yet funded — this family needs a first sponsor

    $
  • 5/8" drywall· 39.19 SF

    5/8" drywall - hung, taped, ready for texture

    $245 total

    Not yet funded — this family needs a first sponsor

    $
  • Trim board· 40.5 LF

    Trim board - 1/2" x 4" - installed (pine)

    $247 total

    Not yet funded — this family needs a first sponsor

    $
  • Tear out wet paneling, bag for disposal - Cat 3· 192 SF

    Tear out wet paneling, bag for disposal - Cat 3

    $248 total

    Not yet funded — this family needs a first sponsor

    $
  • Negative air fan/Air scrubber (24 hr period)· 3 EA

    Negative air fan/Air scrubber (24 hr period) - No monit.

    $251 total

    Not yet funded — this family needs a first sponsor

    $
  • Negative air fan/Air scrubber (24 hr period)· 3 EA

    Negative air fan/Air scrubber (24 hr period) - No monit.

    $251 total

    Not yet funded — this family needs a first sponsor

    $
  • Negative air fan/Air scrubber (24 hr period)· 3 EA

    Negative air fan/Air scrubber (24 hr period) - No monit.

    $251 total

    Not yet funded — this family needs a first sponsor

    $
  • Negative air fan/Air scrubber (24 hr period)· 3 EA

    Negative air fan/Air scrubber (24 hr period) - No monit.

    $251 total

    Not yet funded — this family needs a first sponsor

    $
  • Negative air fan/Air scrubber (24 hr period)· 3 EA

    Negative air fan/Air scrubber (24 hr period) - No monit.

    $251 total

    Not yet funded — this family needs a first sponsor

    $
  • Negative air fan/Air scrubber (24 hr period)· 3 EA

    Negative air fan/Air scrubber (24 hr period) - No monit.

    $251 total

    Not yet funded — this family needs a first sponsor

    $
  • Detach & Reset Range

    Detach & Reset Range - freestanding - gas

    $254 total

    Not yet funded — this family needs a first sponsor

    $
  • Trim board· 42 LF

    Trim board - 1/2" x 4" - installed (pine)

    $256 total

    Not yet funded — this family needs a first sponsor

    $
  • Clean stud wall· 192 SF

    Clean stud wall

    $262 total

    Not yet funded — this family needs a first sponsor

    $
  • Tear out wet drywall, no bagging - Cat 3· 154.58 SF

    Tear out wet drywall, no bagging - Cat 3

    $264 total

    Not yet funded — this family needs a first sponsor

    $
  • Seal & paint paneling· 104 SF

    Seal & paint paneling

    $277 total

    Not yet funded — this family needs a first sponsor

    $
  • Toilet

    Toilet - Reset

    $283 total

    Not yet funded — this family needs a first sponsor

    $
  • Tear out and bag wet insulation - Category 3 water· 172.92 SF

    Tear out and bag wet insulation - Category 3 water

    $285 total

    Not yet funded — this family needs a first sponsor

    $
  • Install Range

    Install Range - freestanding - gas

    $286 total

    Not yet funded — this family needs a first sponsor

    $
  • Paint door/window trim & jamb· 4 EA

    Paint door/window trim & jamb - 2 coats (per side)

    $287 total

    Not yet funded — this family needs a first sponsor

    $
  • Seal & paint paneling· 108 SF

    Seal & paint paneling

    $288 total

    Not yet funded — this family needs a first sponsor

    $
  • Seal/prime (1 coat) then paint (1 coat) the ceiling· 134.94 SF

    Seal/prime (1 coat) then paint (1 coat) the ceiling

    $289 total

    Not yet funded — this family needs a first sponsor

    $
  • Sand exposed framing - Floor· 84.92 SF

    Sand exposed framing - Floor

    $289 total

    Not yet funded — this family needs a first sponsor

    $
  • Scrape part of the walls & prep for paint· 195.67 SF

    Scrape part of the walls & prep for paint

    $290 total

    Not yet funded — this family needs a first sponsor

    $
  • Apply plant-based anti-microbial agent· 693.04 SF

    Apply plant-based anti-microbial agent to more than the walls and ceiling

    $292 total

    Not yet funded — this family needs a first sponsor

    $
  • R&R Baseboard· 44.5 LF

    R&R Baseboard - 2 1/4"

    $295 total

    Not yet funded — this family needs a first sponsor

    $
  • Tear out wet drywall, no bagging - Cat 3· 172.92 SF

    Tear out wet drywall, no bagging - Cat 3

    $295 total

    Not yet funded — this family needs a first sponsor

    $
  • Texture drywall· 76.33 SF

    Texture drywall - smooth / skim coat

    $295 total

    Not yet funded — this family needs a first sponsor

    $
  • Paint door/window trim & jamb· 4 EA

    Paint door/window trim & jamb - Large - 2 coats (per side)

    $299 total

    Not yet funded — this family needs a first sponsor

    $
  • Add for personal protective equipment· 12 EA

    Add for personal protective equipment (hazardous cleanup)

    $303 total

    Not yet funded — this family needs a first sponsor

    $
  • HEPA Vacuuming - Detailed· 272.67 SF

    HEPA Vacuuming - Detailed - (PER SF)

    $306 total

    Not yet funded — this family needs a first sponsor

    $
  • Batt insulation· 98 SF

    Batt insulation - 10" - R30 - unfaced batt

    $308 total

    Not yet funded — this family needs a first sponsor

    $
  • Paint door/window trim & jamb· 4 EA

    Paint door/window trim & jamb - Large - 2 coats (per side)

    $312 total

    Not yet funded — this family needs a first sponsor

    $
  • HEPA Vacuuming - Detailed· 286.38 SF

    HEPA Vacuuming - Detailed - (PER SF) 1st pass

    $321 total

    Not yet funded — this family needs a first sponsor

    $
  • Scrape the walls & prep for paint· 218.89 SF

    Scrape the walls & prep for paint

    $325 total

    Not yet funded — this family needs a first sponsor

    $
  • Texture drywall· 84.92 SF

    Texture drywall - smooth / skim coat

    $329 total

    Not yet funded — this family needs a first sponsor

    $
  • Seal/prime (1 coat) then paint (1 coat) the ceiling· 154.58 SF

    Seal/prime (1 coat) then paint (1 coat) the ceiling

    $331 total

    Not yet funded — this family needs a first sponsor

    $
  • HEPA Vacuuming - Detailed· 295.22 SF

    HEPA Vacuuming - Detailed - (PER SF)

    $331 total

    Not yet funded — this family needs a first sponsor

    $
  • Sand exposed framing - Floor· 98 SF

    Sand exposed framing - Floor

    $334 total

    Not yet funded — this family needs a first sponsor

    $
  • Clean floor or roof joist system· 196 SF

    Clean floor or roof joist system

    $335 total

    Not yet funded — this family needs a first sponsor

    $
  • Equipment setup, take down, and monitoring· 4 HR

    Equipment setup, take down, and monitoring (hourly charge)

    $340 total

    Not yet funded — this family needs a first sponsor

    $
  • HEPA Vacuuming - Detailed· 309.15 SF

    HEPA Vacuuming - Detailed - (PER SF)

    $346 total

    Not yet funded — this family needs a first sponsor

    $
  • Paint door/window trim & jamb· 5 EA

    Paint door/window trim & jamb - 2 coats (per side)

    $358 total

    Not yet funded — this family needs a first sponsor

    $
  • Batt insulation· 143.19 SF

    Batt insulation - 6" - R19 - unfaced batt

    $363 total

    Not yet funded — this family needs a first sponsor

    $
  • Paint paneling· 195.67 SF

    Paint paneling - one coat

    $364 total

    Not yet funded — this family needs a first sponsor

    $
  • HEPA Vacuuming - Detailed· 331.25 SF

    HEPA Vacuuming - Detailed - (PER SF)

    $371 total

    Not yet funded — this family needs a first sponsor

    $
  • Post-Remediation Verification / air clearance- per sample· 5 EA

    Post-Remediation Verification / air clearance- per sample

    $375 total

    Not yet funded — this family needs a first sponsor

    $
  • Texture drywall· 98 SF

    Texture drywall - smooth / skim coat

    $379 total

    Not yet funded — this family needs a first sponsor

    $
  • R&R Baseboard· 52.58 LF

    R&R Baseboard - 3 1/4"

    $395 total

    Not yet funded — this family needs a first sponsor

    $
  • Paint paneling· 218.89 SF

    Paint paneling - one coat

    $407 total

    Not yet funded — this family needs a first sponsor

    $
  • Tear out non-salv vinyl, cut & bag - Category 3 water· 134.94 SF

    Tear out non-salv vinyl, cut & bag - Category 3 water

    $429 total

    Not yet funded — this family needs a first sponsor

    $
  • Scrape the walls & prep for paint· 291.33 SF

    Scrape the walls & prep for paint

    $432 total

    Not yet funded — this family needs a first sponsor

    $
  • Containment Barrier/Airlock/Decon. Chamber· 326.94 SF

    Containment Barrier/Airlock/Decon. Chamber

    $438 total

    Not yet funded — this family needs a first sponsor

    $
  • Asbestos test fee full service survey - base fee

    Asbestos test fee full service survey - base fee

    $450 total

    Not yet funded — this family needs a first sponsor

    $
  • Paint paneling· 244 SF

    Paint paneling - one coat

    $453 total

    Not yet funded — this family needs a first sponsor

    $
  • Sink· 2 EA

    Sink - single - Reset

    $457 total

    Not yet funded — this family needs a first sponsor

    $
  • Paint paneling· 246.33 SF

    Paint paneling - one coat

    $458 total

    Not yet funded — this family needs a first sponsor

    $
  • Sand exposed framing - Floor· 134.94 SF

    Sand exposed framing - Floor

    $459 total

    Not yet funded — this family needs a first sponsor

    $
  • Clean floor or roof joist system· 269.89 SF

    Clean floor or roof joist system

    $461 total

    Not yet funded — this family needs a first sponsor

    $
  • 5/8" drywall· 76.33 SF

    5/8" drywall - hung, taped, ready for texture

    $477 total

    Not yet funded — this family needs a first sponsor

    $
  • Batt insulation· 154.58 SF

    Batt insulation - 10" - R30 - unfaced batt

    $485 total

    Not yet funded — this family needs a first sponsor

    $
  • Tear out non-salv vinyl, cut & bag - Category 3 water· 154.58 SF

    Tear out non-salv vinyl, cut & bag - Category 3 water

    $491 total

    Not yet funded — this family needs a first sponsor

    $
  • Paneling· 104 SF

    Paneling

    $497 total

    Not yet funded — this family needs a first sponsor

    $
  • Batt insulation· 192.92 SF

    Batt insulation - 10" - R30 - unfaced batt

    $516 total

    Not yet funded — this family needs a first sponsor

    $
  • HEPA Vacuuming - Detailed· 461.89 SF

    HEPA Vacuuming - Detailed - (PER SF)

    $518 total

    Not yet funded — this family needs a first sponsor

    $
  • Seal & paint paneling· 195.67 SF

    Seal & paint paneling

    $522 total

    Not yet funded — this family needs a first sponsor

    $
  • Texture drywall· 134.94 SF

    Texture drywall - smooth / skim coat

    $522 total

    Not yet funded — this family needs a first sponsor

    $
  • Vinyl plank flooring· 39.19 SF

    Vinyl plank flooring

    $528 total

    Not yet funded — this family needs a first sponsor

    $
  • Clean floor or roof joist system· 309.15 SF

    Clean floor or roof joist system

    $528 total

    Not yet funded — this family needs a first sponsor

    $
  • 5/8" drywall· 84.92 SF

    5/8" drywall - hung, taped, ready for texture

    $531 total

    Not yet funded — this family needs a first sponsor

    $
  • Paint paneling· 289.33 SF

    Paint paneling - one coat

    $538 total

    Not yet funded — this family needs a first sponsor

    $
  • Tear out and bag wet insulation - Category 3 water· 326.94 SF

    Tear out and bag wet insulation - Category 3 water

    $538 total

    Not yet funded — this family needs a first sponsor

    $
  • Paint paneling· 291.33 SF

    Paint paneling - one coat

    $541 total

    Not yet funded — this family needs a first sponsor

    $
  • HEPA Vacuuming - Detailed· 487.33 SF

    HEPA Vacuuming - Detailed - (PER SF)

    $546 total

    Not yet funded — this family needs a first sponsor

    $
  • Haul debris· 2 EA

    Haul debris - per pickup truck load - including dump fees

    $568 total

    Not yet funded — this family needs a first sponsor

    $
  • Scrape the walls & prep for paint· 383.89 SF

    Scrape the walls & prep for paint

    $569 total

    Not yet funded — this family needs a first sponsor

    $
  • Wood floor covering labor minimum

    Wood floor covering labor minimum

    $582 total

    Not yet funded — this family needs a first sponsor

    $
  • Seal & paint paneling· 218.89 SF

    Seal & paint paneling

    $584 total

    Not yet funded — this family needs a first sponsor

    $
  • Texture drywall· 154.58 SF

    Texture drywall - smooth / skim coat

    $598 total

    Not yet funded — this family needs a first sponsor

    $
  • 5/8" drywall· 98 SF

    5/8" drywall - hung, taped, ready for texture

    $612 total

    Not yet funded — this family needs a first sponsor

    $
  • Underlayment - 1/2" OSB· 154.58 SF

    Underlayment - 1/2" OSB

    $635 total

    Not yet funded — this family needs a first sponsor

    $
  • Equipment decontamination charge· 13 EA

    Equipment decontamination charge - per piece of equipment

    $640 total

    Not yet funded — this family needs a first sponsor

    $
  • 1/2" drywall· 108 SF

    1/2" drywall - hung, taped, ready for texture

    $651 total

    Not yet funded — this family needs a first sponsor

    $
  • General Laborer· 8 HR

    General Laborer - per hour *condo access; to haul material and equipment up to unit; to haul equipment and debris down to truck/ van; clean common hallways.

    $679 total

    Not yet funded — this family needs a first sponsor

    $
  • General clean - up· 8 HR

    General clean - up *This item is intended for general post construction clean-up.

    $709 total

    Not yet funded — this family needs a first sponsor

    $
  • Carpet· 112.7 SF

    Carpet 15% waste added for Carpet.

    $743 total

    Not yet funded — this family needs a first sponsor

    $
  • Paint part of the walls· 345.5 SF

    Paint part of the walls - two coats

    $754 total

    Not yet funded — this family needs a first sponsor

    $
  • Seal & paint paneling· 289.33 SF

    Seal & paint paneling

    $772 total

    Not yet funded — this family needs a first sponsor

    $
  • Seal & paint paneling· 291.33 SF

    Seal & paint paneling

    $777 total

    Not yet funded — this family needs a first sponsor

    $
  • Batt insulation· 326.94 SF

    Batt insulation - 4" - R13 - unfaced batt

    $788 total

    Not yet funded — this family needs a first sponsor

    $
  • 5/8" drywall· 134.94 SF

    5/8" drywall - hung, taped, ready for texture

    $843 total

    Not yet funded — this family needs a first sponsor

    $
  • Paneling· 192 SF

    Paneling

    $917 total

    Not yet funded — this family needs a first sponsor

    $
  • Sand exposed framing - Floor & ceiling· 309.15 SF

    Sand exposed framing - Floor & ceiling Sub floor

    $959 total

    Not yet funded — this family needs a first sponsor

    $
  • 5/8" drywall· 154.58 SF

    5/8" drywall - hung, taped, ready for texture

    $966 total

    Not yet funded — this family needs a first sponsor

    $
  • R&R Floating subfloor· 154.58 SF

    R&R Floating subfloor

    $982 total

    Not yet funded — this family needs a first sponsor

    $
  • R&R Underlayment· 134.94 SF

    R&R Underlayment - 1/2" OSB

    $1,112 total

    Not yet funded — this family needs a first sponsor

    $
  • Vinyl plank flooring· 134.94 SF

    Vinyl plank flooring

    $1,817 total

    Not yet funded — this family needs a first sponsor

    $
  • Vinyl plank flooring· 154.58 SF

    Vinyl plank flooring

    $2,082 total

    Not yet funded — this family needs a first sponsor

    $
Our promise

Every dollar is traceable.

  • 100% reaches this family. Ohana Restore takes nothing from your gift.

  • Every item is tracked. From your gift to the day it is installed in the home.

  • Funds release only after three approvals. The family, the nonprofit, and the contractor.

Leftover funds stay with flood survivors.

The floods took everything inside these homes — beds, furniture, kitchen essentials, the everyday things that make a house a home. If this family’s rebuild is fully funded, any extra goes toward replacing those belongings — or, at the family’s choosing, helps another ʻohana still waiting. Either way, every dollar stays with a flood survivor.